Skip to main content

Project Requirements by Feature

AttributeValue
ProjectOpen Projects Hub
Version1.6
StatusAccepted
ReadinessReady for Implementation
OwnerProduct Owner

Table of Contents​

Purpose​

Single source of truth for requirements organized by feature slices. Detailed requirements are maintained in dedicated feature files.


Feature Map​

Feature IDFeature NameOutcomePriorityStatusOwnerDetails
F-001Client and Project Lifecycle ManagementAdmin keeps client/project records aligned with MVP flowMustClarifiedProduct OwnerF-001
F-002AI Refinement and Approval WorkflowRaw notes become approved, structured user storiesMustClarifiedProduct OwnerF-002
F-003Access Control and Visibility BoundariesAdmin/Member permissions are enforced; clients review via access codeMustClarifiedProduct OwnerF-003
F-004Requirements Backlog and Markdown ExportApproved stories are visible and exportableMustClarifiedProduct OwnerF-004
F-005Minimal OnboardingFirst-time Admin guidance reduces MVP onboarding frictionShouldClarifiedProduct OwnerF-005
F-006Landing Page ExperienceVisitors clearly understand product value and actionsMustClarifiedProduct OwnerF-006
F-007Admin LoginAdmin securely authenticates and accesses workspaceMustClarifiedProduct OwnerF-007
F-008Account CreationNew admin can register and start onboardingShouldClarifiedProduct OwnerF-008
F-009Reset PasswordAdmin can recover account access safelyMustClarifiedProduct OwnerF-009
F-010AI Credits and API Key ManagementUsers get 5 free credits and can add own AI provider keysMustClarifiedProduct OwnerF-010
F-011Client Review AccessClients review approved stories with a project access code, no accountMustClarifiedProduct OwnerF-011

Status Definitions​

StatusMeaningCriteria
DraftRequirements are documented but not yet validated or completeRequirements capture initial understanding; may have open questions or missing acceptance criteria
Review PendingBaseline is complete and under validation reviewAll requirements documented with acceptance criteria; open questions resolved; pending final product owner validation before implementation handoff
ClarifiedCore requirements are validated and stable; ready for implementation planningAll functional requirements reviewed and approved; no open questions; dependencies identified; ready for implementation team to begin technical design
Ready for ImplementationAll requirements validated, reviewed, and implementation team confirmed feasibilityFeature marked "Clarified" + all individual requirements marked "Clarified" + implementation team reviewed and confirmed feasibility

Current Feature Status​

All features (F-001 to F-011) have been validated and moved to Clarified status (2026-07-30).

Next Step: Implementation team has confirmed technical feasibility. Requirements are now Ready for Implementation handoff.

Transition Path: Draft → Review Pending → Clarified → Ready for Implementation ✅


Cross-Cutting Quality Baseline​

IDQuality AreaRequirementMetric / TargetPriorityOwner (DRI)Status
NFR-X01SecurityThe platform adheres to OWASP Top 10 security best practices, including secure credential storage and login protection.OWASP Top 10 checklist satisfied; login attempts are rate-limited; passwords are stored using strong one-way hashing.MustTech LeadClarified
NFR-X02PrivacyThe platform follows GDPR-aligned privacy practices with deletion and archival support.Deleted projects become inaccessible to Admin, Member, and the Client Review Portal within 24 hours; archived projects are excluded from the active-project limit.MustTech LeadClarified
NFR-X03TestabilityMVP core logic keeps an automated test coverage target with visible reporting.Automated tests cover at least 70% of core application logic. Coverage is measured and reported with a diff on every pull request; per ADR-015 it is tracked as a target, not enforced as a merge-blocking gate.MustBackend LeadClarified
NFR-X04ReadabilityClient-facing requirements remain readable to non-technical stakeholders.The Client Review Portal presents user stories with plain-language titles.ShouldProduct OwnerClarified
NFR-X05PerformanceCore project and requirements views remain responsive under MVP load.MVP load: 10 concurrent Admins + 20 client reviewers, 100 requests/min peak, 3 active projects per Admin, 200 total stories. Project list and requirements views render within 2 seconds.ShouldTech LeadClarified
NFR-X06ScalabilityMVP usage limits are supported without data loss or degradation.Supports at least 3 active projects per freelancer account and 500 total user stories without data loss.ShouldTech LeadClarified
NFR-X07AccessibilityPrimary workflows meet baseline accessibility standards.Requirements views meet WCAG 2.1 AA guidelines for contrast, keyboard navigation, and screen reader labels.ShouldUI/UX LeadClarified
NFR-X08Delivery FeasibilityMVP scope remains deliverable in planned schedule.MVP scope is achievable within a 2.5-month delivery window, assuming 2 developers at ~12 story points each per week against the 250 points of remaining MVP work. Revised from 1–1.5 months once the backlog was estimated; see the Capacity Basis in the phased roadmap.ShouldProduct OwnerClarified
NFR-X09Session ManagementUser sessions are secure, time-bound, and manageable across devices.Standard sessions expire after 24 hours; extended sessions after 7 days; concurrent sessions allowed; forced logout capability; session timeout warning 5 min before expiry; refresh tokens rotate on use.MustTech LeadClarified
NFR-X10Email NotificationsPlatform delivers transactional emails reliably with retry and failure handling.95% delivered within 30 seconds; 3 retry attempts with exponential backoff; user feedback on failures; max 10 emails per account per hour; supports verification codes, password reset, and Member invitations.MustTech LeadClarified
NFR-X11DiscoverabilityPublic entry pages are discoverable by search engines and render correct link previews.Public routes expose unique titles, meta descriptions, and canonical URLs; robots.txt and sitemap.xml are published and exclude authenticated routes; shared links render a title, description, and image preview; landing page Core Web Vitals stay within agreed budgets.ShouldFrontend LeadClarified

Infrastructure Decisions for Implementation Team​

The following infrastructure choices impact requirements scope and should guide implementation:

Decision AreaSpecified ChoiceImpact on RequirementsRationale
DatabaseImplementation Team DecisionMust support access control enforcement (NFR-X03); recommend row-level security or application-level ACLRelational database (PostgreSQL, MySQL, etc.) or managed database service that supports MVP requirements
HostingImplementation Team DecisionMust meet performance targets in NFR-X05 and scalability in NFR-X06Any hosting platform (cloud provider, PaaS, or managed service) that satisfies NFR-X05, NFR-X06, and cost constraints
Email ServiceImplementation Team DecisionEmail delivery requirements in NFR-X10 (95% within 30s, retry logic)Any transactional email service (SendGrid, Postmark, AWS SES, Mailgun, etc.) that meets NFR-X10 metrics
Session ManagementImplementation Team DecisionSession requirements in NFR-X09 (24-hour standard, 7-day extended, concurrent allowed)JWT or session tokens acceptable; implementation must meet timeout and refresh requirements
API ProvidersGemini, OpenAI, DeepSeekAI refinement workflow in F-002, F-010; user brings own keysPlatform provides 5 trial credits using platform-managed keys; users configure own API keys for unlimited use

Note: All infrastructure decisions should be documented in the implementation repository's ADRs (Architecture Decision Records), not in this requirements specification. Chosen technologies must satisfy the non-functional requirements (NFR-X01 to NFR-X11).

Validation Checklist for "Ready for Implementation":

Implementation team has confirmed:

  • All feature requirements are clear and unambiguous
  • Acceptance criteria are testable and measurable
  • Technical feasibility confirmed (no hidden blockers)
  • Dependencies between features are understood
  • Quality baselines (NFR-X01 to NFR-X11) are achievable with specified infrastructure
  • Infrastructure choices are appropriate for requirements
  • Scope boundaries (out-of-scope.md) are agreed upon
  • No critical open questions remain

Source References​


Last Updated: 2026-09-08